Oarly team reviewing a product sample and production plan in a modern factory

HOW OARLY WORKS

A clear process
from requirement
to delivery

Every project begins with understanding what your business needs.

From there, Oarly helps clarify the requirement, assess suitable products and supply options, coordinate the agreed manufacturing and quality stages, and support delivery through one managed process.

You do not need a complete technical brief to begin. A product image, link, sample, specification or simple description can be enough for an initial review.

Clear RequirementsSuitable Supply OptionsSample ApprovalProduction VisibilityQuality CoordinationDelivery Support

STEP 01 · SUBMIT YOUR REQUIREMENT

Tell us what you need

Provide as much information as you currently have. A formal product brief is not required at the first stage.

You may begin with a product link, photograph, existing sample, supplier quotation, specification sheet, packaging reference or a short description of the commercial outcome you want to achieve.

The initial information helps Oarly understand whether the enquiry relates to an existing bulk product, a private label opportunity, a product modification or a fully custom manufacturing project.

Helpful information

Product description or reference · Intended use · Estimated quantity · Preferred materials or dimensions · Branding or packaging needs · Target budget or price expectation · Required timeline · Delivery location

Do not delay your enquiry because every detail is not yet confirmed. Oarly can identify the information needed for the next stage.

Product sample, specification drawing and upload materials prepared for an Oarly enquiry

What you can send

  • Product photograph or website link
  • Specification sheet or drawing
  • Existing physical sample reference
  • Current supplier quotation or product details
  • Logo, artwork or packaging reference
  • Required quantity or expected order range
  • Destination country and delivery location
  • Target timeline and known compliance needs

STEP 02 · INITIAL REVIEW

We clarify the requirement before approaching suppliers

Oarly reviews the information provided and identifies any details that need to be confirmed before meaningful sourcing or manufacturing work begins.

This stage helps prevent suppliers from quoting against different assumptions and reduces the risk of comparing options that are not genuinely equivalent.

Oarly may also identify an early commercial, technical, regulatory or logistics issue that should be considered before further work is undertaken.

Product clarity

What is the product, how will it be used and which specifications are essential?

Commercial fit

Are the quantity, target cost, timeline and expected customisation realistic?

Category considerations

Does the category involve special materials, testing, certification, labelling or shipping constraints?

Available information

What samples, drawings, artwork, reports or supplier records are still required?

Possible outcome: Oarly may request clarification, recommend a preliminary assessment, confirm the next sourcing stage, or advise that the project is not currently suitable for Oarly to undertake.

STEP 03 · PRODUCT & SUPPLY ASSESSMENT

We identify the most suitable supply pathway

Not every requirement should be handled in the same way. Oarly assesses the best pathway according to the product, category, quantity, customisation and commercial objective.

Existing Product / Bulk Supply

Best when the product already exists and the main need is commercial quantity, price, packaging and reliable supply.

Private Label

Best when an established product can carry the client’s brand, labels, packaging or presentation changes.

Existing Product + Modification

Best when colour, size, material, components, features or packaging need to change.

Fully Custom Manufacturing

Best when the product begins with a concept, drawing, sample, technical specification or new design.

Assessment factorsProduct experience · Factory capability · Materials and equipment · MOQ · Quality systems · Lead time · Scalability · Communication · Export experience · Category-specific compliance considerations

Specialised or regulated products may require a separate preliminary review before supplier engagement, sampling or quotation work begins.

STEP 04 · SUPPLY OPTIONS & PROPOSAL

Review the proposed product, commercial terms and service scope

Once the requirement is sufficiently clear, Oarly assesses suitable supply or manufacturing options and prepares a proposal or quotation based on the agreed information.

A bulk order may focus on specifications, quantity, unit pricing and delivery. A custom project may require development costs, sample stages, tooling, packaging, production milestones and a more detailed quality process.

The proposal should identify material assumptions and exclusions so that the parties understand what has and has not been included.

A proposal may include

Product or manufacturing specification · Supplier or production option · Unit price and currency · MOQ · Sample or development charges · Tooling · Packaging options · Production lead time · Quality assurance scope · Freight basis · Service fees · Payment stages · Assumptions and exclusions

PROJECT PROPOSALOARLY
ProductAgreed specification
MOQConfirmed for project
Lead TimeAssumptions stated
SampleStage and scope
Quality ScopeChecks documented
Delivery BasisMethod and terms

No invented prices. Commercial details are prepared for the confirmed requirement.

Decision point: Review the option, ask questions and confirm whether to proceed to samples, further development or order confirmation.

Engineers comparing prototype samples, materials and packaging before approval

STEP 05 · SAMPLES & APPROVAL

Confirm the product before full production

Where appropriate, a sample is sourced, prepared or developed for client review before full production begins.

The client may review materials, dimensions, function, colour, workmanship, branding, packaging and other agreed characteristics. Feedback is communicated and, where required, further sample development may be coordinated.

An approved sample can provide an important production reference, but the reference standard, permitted tolerances and inspection method should still be recorded clearly.

Existing Sample

A standard supplier sample confirms an established product before a bulk order.

Branded or Modified Sample

Selected branding, colour, material, component or packaging changes are reviewed.

Prototype or Development Sample

A new or substantially customised product develops through one or more sample stages.

Approval may cover: Product specification · Materials · Dimensions · Colour reference · Logo placement · Packaging · Labels · Instructions · Workmanship reference · Functional requirements

Sample approval does not remove normal manufacturing tolerances or every production risk. Record the agreed production and inspection criteria separately where necessary.

STEP 06 · ORDER & PRODUCTION

Move from approval into managed production

Once specifications, samples, commercial terms and the applicable payment stage are confirmed, the order can proceed.

Oarly coordinates the agreed supplier communication, production schedule, specification records and key milestones. Material changes, issues or delays are communicated during the process, subject to the level of management included in the project scope.

A repeat order may require limited monitoring, while a new custom product may require more frequent coordination and checkpoints.

Order Confirmation

Confirm product, quantity, packaging, pricing, payment, timing and applicable terms.

Production Scheduling

Establish target stages, material timing and the shipment-readiness date.

Progress Visibility

Monitor agreed milestones and provide relevant status updates.

Issue Coordination

Clarify specifications, escalate material issues and coordinate practical responses.

STEP 07 · QUALITY ASSURANCE

Check against the agreed requirements

The appropriate quality process is determined according to the product category, order value, complexity, previous supplier performance and risk profile.

Oarly helps coordinate agreed quality specifications, reference samples, packaging requirements and suitable checking or inspection processes. Checks may be performed by the manufacturer, an Oarly service partner or an appropriately qualified independent provider.

Before ProductionSpecification, approved sample, materials, packaging and quality criteria.
During ProductionProgressive or in-process checks where appropriate.
Before ShipmentQuantity, workmanship, packaging, labelling and agreed checks.

Possible outputs: Inspection report · Photographs · Quantity records · Defect information · Packaging check · Corrective action request · Reinspection recommendation · Shipment readiness decision

No inspection can guarantee the absence of every defect or eliminate all quality and compliance risk. Confirm the scope, sampling method, acceptance criteria and responsibilities.

Quality inspector measuring a manufactured component against the agreed specification
QUALITY REVIEWSpecification referenceQuantity and workmanshipPackaging and labellingIssue reporting

STEP 08 · FREIGHT & DELIVERY

Coordinate shipment from supplier to destination

Oarly works with suitable logistics providers to coordinate the movement of goods from the supplier to the agreed destination.

The process may involve factory collection, consolidation, export documentation, sea or air freight, customs brokerage, destination charges, delivery appointments and shipment tracking.

Sea Freight

Often suitable for larger commercial shipments and less time-sensitive orders.

Air Freight

Often suitable for smaller, urgent or higher-value shipments.

Consolidated Freight

May combine suitable shipments to improve logistics efficiency where available.

Possible coordination: Freight quotations · Shipping-method comparison · Export documents · Consolidation planning · Booking coordination · Customs-broker referral · Shipment tracking · Destination delivery

Freight forwarding, customs brokerage, transport and related regulated services are performed by appropriately qualified providers where required. Duties, taxes and destination charges depend on the agreed terms.

Container terminal coordinating sea freight, cargo transport and delivery

STEP 09 · AFTER DELIVERY

Support repeat supply and future improvements

For ongoing commercial products, Oarly can retain relevant specifications, packaging information, supplier records and previous order requirements to make repeat purchasing more efficient.

Feedback after delivery can help identify quality, packaging, cost, logistics or product-development improvements for the next order. Where appropriate, Oarly may review alternative supply capacity or product extensions as the business grows.

Quality Feedback

Record observations and identify corrective or preventive action.

Repeat Order Planning

Review quantities, lead times, inventory needs and production windows.

Packaging Improvements

Consider protection, presentation, labelling, cartons and freight impact.

Cost and Freight Review

Reassess product cost, order size, consolidation and shipping.

Supply Continuity

Maintain key product records and consider alternative capacity.

Product Extensions

Explore sizes, colours, bundles, categories or private label additions.

A COLLABORATIVE PROCESS

Clear information and timely decisions help keep the project moving

Oarly manages the agreed coordination, but successful sourcing and manufacturing also depend on the client providing accurate information, reviewing options and making decisions at the appropriate stages.

Helpful client inputs

  • A clear intended use
  • Realistic quantity range
  • Essential and optional specifications
  • Reference images or samples
  • Destination-market information
  • Branding, artwork and budget expectations
  • Decision-makers and approval process
  • Timely feedback and notice of changes

Why it matters

  • Suppliers quote more accurately
  • Samples use the correct criteria
  • Production changes are controlled
  • Quality expectations are clearer
  • Compliance pathways are considered earlier
  • Freight options are compared meaningfully
  • Missing-approval delays are reduced

The strongest projects begin with a clear commercial objective, even when the technical details still need to be developed.

FLEXIBLE BY DESIGN

Not every project requires every stage at the same level

The process is adjusted to the work actually required. Oarly does not add unnecessary development stages to a straightforward purchase, and it does not treat a complex custom product as if it were a simple catalogue order.

SHORTER PATHWAY

Existing Bulk Product

Requirement review, supplier option, quotation, sample where needed, order coordination, quality check and freight.

MEDIUM PATHWAY

Private Label or Modified Product

Adds branding, packaging, material or specification changes, sample approval and more detailed coordination.

LONGER PATHWAY

Fully Custom or Specialised Product

May require technical clarification, development samples, tooling, testing, specialist review, multiple approvals and a detailed quality plan.

Process variation factorsProduct category · Technical complexity · Customisation · MOQ · Tooling · Quality risk · Regulatory requirements · Order value · Supplier history · Shipping restrictions · Destination market

CLEAR ROLES

Appropriate expertise for each stage

Oarly coordinates the commercial and operational process within the agreed scope and acts as a clear point of contact between the client and relevant suppliers or service providers.

Where specialist services are required—such as laboratory testing, product certification, registration, legal advice, customs brokerage, dangerous-goods handling or independent inspection—Oarly may coordinate with appropriately qualified third-party providers.

Responsibilities, service fees, third-party charges, assumptions and exclusions should be confirmed before the relevant work proceeds. Supplier selection, sampling, inspection, testing or coordination cannot eliminate every commercial, quality, delivery or compliance risk.

Product TestingCertificationRegistrationIndependent InspectionCustoms BrokerageFreight ForwardingDangerous GoodsLegal or Technical Advice

FREQUENTLY ASKED QUESTIONS

Questions about working with Oarly

These answers cover the process, product categories, minimum order quantities, samples, existing suppliers, third-party services, payment stages and common project risks.

Do I need a complete product specification before contacting Oarly?

No. Begin with a product link, image, sample reference, drawing or simple description. Oarly can identify what must be clarified before meaningful sourcing or manufacturing work begins.

How long does the process take?

Timing depends on the category, customisation, samples, supplier availability, production lead time, quality process and freight method. Oarly provides available timing information and assumptions as the project becomes clear.

Will every project go through all nine stages?

No. The nine stages are a framework. A bulk order may use a shorter process, while a custom, specialised or regulated product may require additional development, testing or approvals.

Can Oarly begin from a product link or competitor reference?

Yes. A reference can communicate intent, but Oarly must confirm the relevant features, materials, dimensions, branding and commercial requirements. Intellectual-property and design rights must be respected.

Can I use my existing supplier?

Yes. Oarly may assist with production coordination, specification clarification, quality assurance, inspection coordination or logistics even when the supplier has already been selected.

Are samples always required?

Not always. Samples are often useful for new suppliers, private label, modified or custom products, but the need depends on the product, order value, previous experience and risk profile.

Does sample approval guarantee that every production unit will be identical?

No. Manufacturing normally involves defined tolerances and variation. The approved sample is an important reference, but quality criteria, inspection scope and acceptable tolerances should also be confirmed.

Who performs inspections, testing and certification?

Checks may be performed by the manufacturer, an Oarly service partner or an appropriately qualified independent provider. Laboratory testing, certification, registration and specialist services are handled by qualified providers where required.

When is payment required?

Payment timing depends on the quotation and project. It may include sample or development charges, deposit, production balance, service fees, third-party costs and freight. Applicable stages are confirmed before work begins.

What happens if a problem arises during production or shipment?

Oarly helps identify material issues, communicate them clearly and coordinate a practical response. The available remedy depends on the cause, evidence, contract terms, supplier response and project circumstances.

Can Oarly help with a product that is not listed in Categories?

Possibly. Categories are representative rather than a fixed catalogue. Send a description, image, link, specification or sample reference and Oarly will assess whether a suitable pathway may be available.

Is there a minimum order quantity?

MOQ varies by product, manufacturer, materials, packaging, branding and customisation. The relevant MOQ is confirmed when suitable supply options are reviewed.

Does Oarly publish fixed wholesale prices?

No. Pricing depends on specification, quantity, packaging, current production costs, destination, freight and project scope. It is prepared for the specific requirement.

Can Oarly support only one stage of the process?

Yes. Oarly may provide a targeted service such as supplier assessment, production coordination, quality inspection coordination or logistics support. The agreed scope should be documented before work begins.

Can Oarly guarantee product compliance, quality or delivery dates?

No. Oarly helps define requirements, coordinate suitable checks and manage the agreed process, but cannot guarantee that every defect, delay, regulatory issue or third-party disruption will be eliminated.

START THE PROCESS

Tell us what you are looking for

Send us the product information you currently have—whether it is an existing product required in bulk, a private label opportunity, a modified product or a new manufacturing concept.

Oarly will review the requirement and help identify an appropriate next step.